BESS Development Engineer
Posted 14 Aug 2026
Advertised as “BESS Development Engineer, Senior or Staff”
BranchFactor Summary
The original posting with the fluff stripped out
- Expected experience
- 5+ yrs
- Management level
- Individual contributor
- Contract
- Full-time
No salary listed for this role.
Field of studyEngineering
Study levelBachelor's or higher
About Redwood Materials
Redwood Materials was founded in 2017 by JB Straubel, co-founder and former CTO of Tesla, on a simple but radical idea: the critical minerals powering the energy transition already exist. They just need to come back. Today Redwood is the largest lithium-ion battery recycler in North America — recovering, refining, and redeploying critical minerals from end-of-life batteries back into the supply chain. On the energy side, Redwood has deployed the largest second-life battery project in the world, delivering power to AI data centers in months rather than years using proprietary energy architecture engineered entirely in-house. The company is profitable, the market it operates in is projected to grow 20 to 50 times over the next decade, and Redwood is the only company with the supply chain, the technology, and the operational scale to lead it.
Position Summary
Redwood Materials is deploying large-scale battery energy storage systems that power data centers and the nation's grid. Founded by Tesla co-founder and former CTO JB Straubel, Redwood closed a $425M Series E in January 2026 and was named to Fast Company's 50 Most Innovative Companies for 2026. Redwood’s energy storage business is scaling fast - we built North America's largest microgrid (63 MWh) for AI infrastructure company Crusoe, signed a partnership with GM to deploy stationary storage using both new and second-life EV batteries, and are now bringing that same battery energy storage system to Rivian's Normal, Illinois manufacturing plant.
The Senior or Staff BESS Development Engineer will join as an early member of a new engineering team working on our Battery Energy Storage System product line, specializing in BESS projects at the initiation and concept phases — turning incomplete, ambiguous inputs into a buildable scope, a concept design, and a permitting/interconnection path. The role balances speed and depth: it must move fast enough to support active pursuits while setting up projects for execution success.
The ideal candidate is highly self-driven, adaptable to a startup environment, and comfortable operating where processes are still being built. You’re a doer and a builder, excited about working in a dynamic, fast-paced setting, and want to shape how Redwood delivers energy storage projects at scale.
- Early feasibility Business Development support: Development Engineer produces concept (feasibility) layouts and draft single-line diagrams from the BESS Product Team’s product specs and architecture guidance while customer discussions are in progress.
- Advanced proposal support: Development Engineer finalizes EPC concept, scope, and cost basis behind business development’s proposal and provides technical exhibits that attach to the contract.
- EPC Scope and Basis of Design (BOD): After a contract is signed and system architecture and inverter selection are finalized, the Development Engineer documents EPC scope and Basis of Design.